| Location |
1111
& 1177 Summer Street are two office buildings in
the Summer Street Corridor of Stamford, Connecticut. |
| Building
Area |
123,578
square feet on 6 office stories |
| Site
Area |
1.58
acres |
| Amenities |
Within
a short walk of Stamford’s restaurant row,
the new Marriott Courtyard and Target/Citibank retail
center to the south, and the Ridgeway Shopping Center
and Sheraton Hotel to the north. |
| Accessability |
With
three separate means of ingress and egress, 1111 & 1177
Summer Street is conveniently accessible from both
Hoyt and Oak Streets (East-West), connecting the
property to every major north-south Stamford CBD
roadway, including both Interstate 95 (0.9 miles)
and the Merritt Parkway (3.9 miles). |
| Ownership |
Maiden
Lane Company |
| Management |
Albert
B. Ashforth, Inc. provides an experienced on-site
property management team. |
| Year
Built |
1978 |
| Major
Tenants |
Ernst
& Young; Parker Global Strategies, LLC; Cardiology
Associates of Fairfield County, Pavarini Construction
Company and Patriot National Bank |
|
| Construction |
Building
structure: Steel framed structures with reinforced
concrete foundations. Formed concrete outer walls
and concrete masonry interior walls. Facade: Aluminum-framed
bands of mirrored vision glazing alternating with
mirrored spandrel glazing at each floor level. |
| Roof |
1111
Summer Street: Gravel coated built up roofing system
installed in 2004. 1177 Summer Street: Carlistle
0.060-mil EPDM rubber membrane installed in 1999. |
| HVAC |
Heating:
Each building has two Cleaver-Brooks Model CB-900-60
boilers rated at 2,511 MBH heat capacity. Cooling:
Each building has 2 package rooftop units (Carrier
Model 30GTN130-620KA) rated at 271-Amps. HVAC rtu
tonnage is 130 per building. |
| Floor
Plates |
Concrete
slab-on-subgrade flooring. |
| Electrical |
Each
building is served with 1,600 amps 277/480-volt three
phase, four-wire electrical service. |
| Life
Safety |
The
property is fully sprinklered; the office compartment
is equipped with a wet system, while the garage has
a dry system. Hard-wired smoke detectors, manual
pull stations and fire extinguishers throughout the
building provide additional protection. There are
separate Fire Life Alarms, Inc. Model MS-521OUD fire
alarm command station panels in the first floor lobbies
of each building. |
| Security
& Access |
Secured
24 hours a day, seven days a week, uniformed security
posted in lobbies and card access sytem for all admittance
to offices. |
| Elevators |
Two
Westinghouse automatic passenger elevators with a
capacity of 2,500 lbs. are located in each building.
Each elevator travels between the upper level of
the basement of the sixth floor at 300 FPM. |
| Parking |
353
total parking spaces, 197 of which are in a two-level
parking garage. |
|